We test, repair and document emergency lights and exit signs so they come on when the power goes out and stay on for as long as your building’s design requires.
We test and inspect all emergency and exit lighting systems for battery functionality, bulb performance, and visibility under low-light or failure conditions. Any issues identified (wiring, fittings, power supply or visibility) are repaired or replaced swiftly. All service complies with applicable Ontario Fire Code requirements.
What’s included
- Monthly function test on simulated power failure
- Annual full-duration test under simulated power failure
- Battery, terminal and charger checks
- Exit sign visibility and battery back-up tests
- Repairs and replacement of failed units
- Written test records
What the Ontario Fire Code requires
Self-contained emergency lighting units must be inspected monthly (pilot lights, terminals and battery condition) and tested monthly to show they work on power failure. At least every 12 months they must be tested for their full design duration, followed by a check of the charging system (Article 6.7.1.6). Exit signs with battery back-up are checked monthly and for full duration annually (Article 6.7.1.8).
After a failed test
Any problem we find, such as a weak battery, a failed lamp, a faulty charger or a damaged fitting, is repaired or the unit is replaced, then retested so your records show the system working.

Questions about emergency lighting inspection & repair
How often must emergency lights be tested in Ontario?
Self-contained emergency lighting units must be tested at least monthly to confirm they work on power failure, and at least every 12 months for their full design duration (Ontario Fire Code Article 6.7.1.6).
Do exit signs need testing too?
Yes. Exit signs are inspected at least every 12 months, and those with battery back-up also monthly, to confirm they stay visible when the main power fails (Article 6.7.1.8).
Requirements summarised from the Ontario Fire Code (O. Reg. 213/07). Your local fire department has the final say for your building.


